Green Mountain Project

Green Mountain Project is divided into three parts :

 

  • Green Mountain East Project(Project-5)
  • Green Mountain North Project(Project-6)
  • Green Mountain West Project(Project-7)

Project 5, 6 and 7 all  lie in the northeastern part of the GDB in Sweet Water County.

These projects are immediately  adjacent to 14mlbs deposits of Ur-Energy

  • Total No of holes =50

  • 22 holes=(100-300 ppm)

  • 28 holes= Anamolous

  • Estimated claims=47

Green Mountain East Project(Project-5)

Green Mountain Section 5 and 8 (Project 5)

The project is adjacent to 14 mlbs deposits of Ur-Energy and Ur-Energy Lost Creek project of 18mlbs of U3O8

Green Mountain North Project(Project-6)

Green Mountain North (Project-6)

The Project lies in the northeastern part of the GDB in Sweet Water County

Our Green Mountain Project divided in 3 parts i.e. East, North and West

In addition to chemical uranium, there are 76 drill holes have radiometric data with a depth of 150-450 ft.

It is likely that deeper holes  up to 600-700 ft will encounter more productive uraniferous horizons.

Total No of holes with Chem U3O8 =13

13 holes = (100-300 ppm)

Estimated claims = 15

Green Mountain West project lies in Sweet Water country

The project is right in the center of extensive uranium exploration activities and known uranium deposits

Total No of holes with Chem U3O8 =13

13 holes = (100-300 ppm)

Estimated claims = 15

  • Green Mountain West Project just lies west of Green Mountain North Project.
  • All these projects boundaries are adjacent to each other.
  • The project vicinity shows great mineralization potential.
  • Total No of drill holes are 7 in the project boundary.
  • 5 holes=(100-300 ppm)
  • 2 holes= (300-700 ppm).
  • Estimated claims=20
  • In the vicinity of project several companies are operating currently namely UEC Corp,NFU Wyoming LLC and Branka Minerals LLC
Scroll to Top